Preconstruction estimating
Conceptual through bid-level cost estimates for civil and site development scopes: earthwork, utilities, stormwater, paving, and erosion and sediment control, built to be defended, not just presented.
Civil and Sitework Cost Estimating
I estimate civil and sitework costs for the scopes where the ground, the design, and the market collide.
About
Sitework is where budgets break. It is the scope with the most unknowns, the least design definition at the moment decisions get made, and the fewest people watching the total picture. I have spent more than twenty years watching it, as an estimator on heavy civil and site development projects and as the founder of a national sitework estimating consultancy.
My work covers the full arc of preconstruction: conceptual budgets, earthwork balance and import export exposure, erosion and sediment control, utilities, stormwater management, and the bid-level detail that decides whether a number survives contact with a real site. I hold the CPE and CPESC credentials, and I serve as Vice President of ASPE's New Jersey chapter.
Alongside the project work, I write and speak. My essays and articles have run in Estimating Today, Design Cost Data, and I present nationally on earthwork cost risk, stormwater economics, and what estimating actually is. The through-line in all of it is the same: someone has to own the whole picture, and on most projects, no one does.
What I Do
Conceptual through bid-level cost estimates for civil and site development scopes: earthwork, utilities, stormwater, paving, and erosion and sediment control, built to be defended, not just presented.
Cut and fill balance, import and export exposure, unsuitable materials, dewatering, and the geotechnical realities that quietly decide project cost long before anyone prices a pipe.
Independent review of value engineering and design decisions against site conditions and market pricing, because a savings on paper can be an import bill in the field.
Writing
Essays and articles in Estimating Today and Design Cost Data - plus a forthcoming peer-reviewed paper on estimating excavation costs on the Moon.
On the gap between what erosion and sediment control is supposed to do and what the industry's practices actually accomplish, written from twenty years inside the numbers.
Design Cost Data · 2026
Read article“Sitework cost is not a property of the design. It is what happens when the design meets the site and the site meets the market.”
Speaking
Presentations for estimators, engineers, and owners on earthwork cost risk, stormwater economics, and erosion and sediment control.
Upcoming · October 2026
NYSSPE. Why earthwork is the scope most likely to break a budget, and what owners and engineers can actually do about it before the bid.
NJ ASPE · 2024
Four functionally equivalent detention systems, a nearly three-to-one cost spread, and the site conditions that flip which one wins.